Work day this Saturday 830-12 in preparation for Chain Shot
A few things that need done are ;
Weed wack edges of fairway to make locating discs easier holes 15, 18 especially
Mow Low area on 15 by walking bridge/moat area and some pruning
6 could use some pruning along the shoreline from the landing area to the long pin.
And whatever else we think needs done.
Matt Dungan › Portage Lakes DGC September 6, 2018 at 9:16pm
Work day this Saturday 830-12 in preparation for Chain Shot
A few things that need done are ;
Weed wack edges of fairway to make locating discs easier holes 15, 18 especially
Mow Low area on 15 by walking bridge/moat area and some pruning
6 could use some pruning along the shoreline from the landing area to the long pin.
And whatever else we think needs done.