Mike Phillips is scheduling a work party at 9:00am this Saturday (10/20/12) to clean up the trees that Ranger Steve is cutting down this week at Stub Stewart. Steve is cutting down 4 trees each on the fairways of holes 15 & 16. Because the trees that he is cutting are pretty large we really need to go in there and remove the wood he is bucking. We will have the use of the gators, wheelbarrows and the one ton. This is going to be the last organized work party at Stub this year due to the rain that will be coming, so we are hoping for a good turn out so we can get as much done as possible.
Also on the agenda is the removal of the stump behind 15's tee pad and removing the choker chain on the fairway of hole 15. We will also have an eagle scout working on the installation of the remaining benches that go on the back 9 holes: holes 13-18.
The remaining work at Stub should be some chipping for the rangers, some building projects for certain greens & stairs on fairways which will be tackled next spring. We will also be installing the new tee signs some time this winter or early spring after the final placements are determined on Holes 12, 13, 14, 16, 17 & 18.
Weather looks like possible showers so dress accordingly. If there is interest after we are done to play doubles then I can organize that. I am hoping to bring some snacks and drinks for after the work party but I will need a head count so please email the group back saying whether you can make it or not.
In case it has been a while since you've been out there, due to a lot of hard work by Mike Phillips and a few other people, the course at Stub Stewart is really starting to come together.
Please consider coming out on Saturday to help us get all of this work done.
Stumptown Disc Golf October 16, 2012 at 9:42pm
Stub Stewart Work Party - This weekend!!!!
Hey Peoples!!!
Mike Phillips is scheduling a work party at 9:00am this Saturday (10/20/12) to clean up the trees that Ranger Steve is cutting down this week at Stub Stewart. Steve is cutting down 4 trees each on the fairways of holes 15 & 16. Because the trees that he is cutting are pretty large we really need to go in there and remove the wood he is bucking. We will have the use of the gators, wheelbarrows and the one ton. This is going to be the last organized work party at Stub this year due to the rain that will be coming, so we are hoping for a good turn out so we can get as much done as possible.
Also on the agenda is the removal of the stump behind 15's tee pad and removing the choker chain on the fairway of hole 15. We will also have an eagle scout working on the installation of the remaining benches that go on the back 9 holes: holes 13-18.
The remaining work at Stub should be some chipping for the rangers, some building projects for certain greens & stairs on fairways which will be tackled next spring. We will also be installing the new tee signs some time this winter or early spring after the final placements are determined on Holes 12, 13, 14, 16, 17 & 18.
Weather looks like possible showers so dress accordingly. If there is interest after we are done to play doubles then I can organize that. I am hoping to bring some snacks and drinks for after the work party but I will need a head count so please email the group back saying whether you can make it or not.
In case it has been a while since you've been out there, due to a lot of hard work by Mike Phillips and a few other people, the course at Stub Stewart is really starting to come together.
Please consider coming out on Saturday to help us get all of this work done.
Jeff